XO Communications’ Roseville data center is located at 1390 Lead Hill Blvd, 1st floor, Roseville, CA 95661. The data center building is slab on grade structure with a 12 foot ceiling height. The facility also provides secure loading docks, and has onsite parking available.
The data center offers Roseville colocation space through full size secured locking cabinets and customized cage space. The data center is regularly audited in accordance with SSAE 16 SOC 3 requirements, and also offers solutions that meet the rigorous compliance standards for HIPAA, PCI and SOX 404. The XO data center provides excellent security measures like on site security officers, 24×7 closed circuit televisions (CCTV), an Open Sound Control (OSC) monitoring system, and has a secure entry through the use of biometric authentication and key card access control system. All access in the data center is remotely monitored by the XO NOC. The data center is equipped with pre action dry pipe and FM 200 gas based fire suppression system that is located throughout the facility to meet any fire emergency.
The Roseville data center provides a reliable power infrastructure with single feed AC commercial power services. The entire critical infrastructure is protected by a two battery string UPS system capable of providing 9 minutes of backup time at full load in the event there is a loss of utility power. Standby diesel generators are connected to an automatic transfer switch (ATS) that provide emergency power for prolonged power outages. The generators are test run on a weekly basis and full load tested on a monthly basis, with enough onsite fuel storage for 24 hours of continuous runtime. The data center power room is separated from technical space with diverse power being delivered by multiple PDUs in true A+B design to each cabinet, and provides a power density of 4kW per cabinet or 160 watts per square foot. The data center provides DC power options designed for greater than 4 hours of battery reserves on multiple N+1 battery strings. The entire power infrastructure has monthly preventive maintenance performed and semi-annual comprehensive maintenance performed. The HVAC in a N+1 redundant configuration effectively controls the cooling and humidity in the data center. The HVAC units maintained via air-cooled precision cooling system have monthly preventive maintenance performed as well as quarterly comprehensive maintenance performed.
XO Communications’ 1390 Lead Hill Blvd data center is a carrier neutral facility with connectivity options to a private network. The facility has switched and dedicated access to transport facilities via high-capacity metropolitan and long haul XO network facilities. The data center has a fully redundant network infrastructure offering 100% SLA on network and server availability. The data center provides VLANs, customized firewalls, site to site VPN, load balancing and multicast, and IDS/IPS. The on site staff provide help desk support services, and remote hands services.
About XO
Roseville, CA 95661
View all XO data center locations. You may also view all data centers in Roseville, or expand your search to all California data centers.
XO Communications – Roseville Data Center Highlights
- Secure Loading Docks
- Onsite Parking Available
- Slab On Grade Structure
- 12 Feet Ceiling Height
- Colocation
- Full Size Secured Locking Cabinets
- Customized Cage Space
- Compliance and Certifications
- SSAE 16 SOC 3
- HIPAA
- PCI
- SOX 404
- Security
- Onsite Security Officers
- 24×7 Closed Circuit Televisions (CCTV) and Open Sound Control (OSC) Monitoring System
- Biometric Authentication
- Key Card Access Control System
- Remotely Monitored by XO NOC
- Fire Detection and Suppression System
- Pre Action Dry Pipe Fire Suppression System
- FM 200 Gas Based Fire Suppression System
- Single Feed AC Commercial Power Services
- UPS System with Two Battery Strings Providing 9 Minutes of Backup Time
- Standby Diesel Generators
- Fuel Storage Onsite for 24 Hours of Continuous Runtime
- Generators Test Run On Weekly Basis and Full Load Tested on Monthly Basis
- Automatic Transfer Switch (ATS)
- Data Center Power Room is Separated From Technical Space
- Multiple PDUs
- Dual Distribution Paths in True A+B Feeds
- Power Density
- 4 kW Per Cabinet
- 160 Watts Per Square Feet
- DC Power System
- Designed for Greater Than 4 Hours of Battery Reserves
- Multiple N+1 Battery Strings
- Power Infrastructure Maintenance
- Monthly Preventive Maintenance
- Semi-Annual Comprehensive Maintenance
- HVAC Units Maintained Via Air Cooled Precision Cooling System in N+1 Redundant Configuration
- HVAC Maintenance
- Monthly Preventive Maintenance
- Quarterly Comprehensive Maintenance
- Carrier Neutral Facility
- Fully Redundant Network Infrastructure
- 100% SLA on Network and Server Availability
- Helpdesk and Support Services
- Remote Hands Services